MET A application
The original meteorological-tower application for Bear Head Camp parcel 27-003-101. Includes the site narrative and proposed coordinates.
COMMUNITY-HOSTED COPY · ACCESS CHECKED OCT 30, 2026
Search the source files behind our reporting. Read the application packets, correspondence, technical findings, and recorded release in full.
6 documents
The original meteorological-tower application for Bear Head Camp parcel 27-003-101. Includes the site narrative and proposed coordinates.
The original meteorological-tower application for Collins Pine parcel 27-004-200. A MET application is not a final wind-turbine layout.
The developer discusses an active gas well near MET A. An attached DEP email explains the agency’s role and recommends safety practices and operator coordination.
The developer withdraws the MET A township application to change its location. The packet also includes the September 2 FAA determination for the specified MET B proposal.
The survey findings, interpretation limits, and differing project numbers in the report packet. The report’s scope should be read with its conclusions.
The recorded release of a specific 2024 meteorological-tower easement in Liberty Township. Instrument 202602331; Book 1115, page 193.
These are archive copies of apparent original documents, not independently certified custodian copies. Page references use the PDF viewer’s page count, which can differ from printed page numbering. A linked PDF opens in a new tab; if your device downloads it, open the downloaded file. Report a broken link or submit a newer record ↗